Crystal Palace - Planning and activities for the EE


Crystal Palace at CERN: Bat 168-R-F05, x73692

Meeting room 20-01-004 (above Crystal Palace), tel: 022-7675958  booking for 20-1-004
Secretary for room - Veronique Wedlake
 78116

People list:
CERN         : Alfredo=Alfredo Placci, Wolfgang=Wolfgang Funk, Claude=Claude Charles Detraz,
                  : Jose=Jose Mulon, Mario=Mario Scandurra
RAL           : RJSG=Justin Greenhalgh, JAH=John Hill, ABL=Tony Lodge, KWB=Ken Bell, Brian=Brian Smith
                  : DJAC=David Cockerill, Claire=ClaireShepherdThemisocleous

IHEP          : Slava=Viatcheslav Grishin, Vassili=Vassili Katchanov
INR            : Nikolai=Nikolai Golubev, Vladimir Postoev
Imperial    : Matt Ryan

Milestones
EE activities 2005/6, D Cockerill pdf doc

2005
Minutes, A Placci 8.11 doc
Important discussions, Fri 24 June 2005:
DSCN2264.jpg (589608 bytes) DSCN2265.jpg (590497 bytes) DSCN2266.jpg (539664 bytes) DSCN2267.jpg (587410 bytes)
Minutes, D Cockerill 6.06 doc
Minutes, A Placci 23.05 doc
Minutes, D Cockerill 25.04 doc
Minutes, A Placci 4.04 doc
Minutes, A Placci 14.02 doc

Discussion - Assembly of EE at CERN, D Cockerill 2.2.05 doc
Minutes, A Placci 25.01 doc

2004
Minutes, D Cockerill 15.12 doc
Minutes of Installation Meeting, K Bell 23.11 doc
Minutes, A Placci 15.11 doc

Minutes, A Placci 1.11 doc
Suggested responsibilities/tasks for the Crystal Palace, P Bloch 21.10 txt txt2 doc


Tue 26 Oct 2004
Suggested tasks from RAL, RJSG/JAH/ABL/KWB:

     1) Dry mount of all Positional Spacers on 1 (?2) Dee, including shoulder bolts,
     2) Make sure geometry really looks plausible
     3) Make sure all shoulder (& conventinal) bolts fit
     4) Check status/required delivery date of the other 2 Dummy Dees - they need to be mounted early in Jan.
     5) Check patch panel status
 Suggested tasks from CERN, Claude:
     1) Design modifications to
glue VPTs to crystals with the Barrel (bldg27) system (Mario)
     2) 
Drawing of new feet for frame (Mario)
     3)  Clarify interaction with Sourkov/Levin for installation modifications to the frames
     4)  Preparation for meeting with Saclay on Wed Nov 4 

Suggested tasks from DJAC:
     1) Prepare for ECAL Electronics test stand for umbilical/HVcards/noise tests
     2) SC construction database