Crystal Palace at CERN: Bat
168-R-F05, x73692
Meeting room
20-01-004 (above Crystal Palace), tel: 022-7675958
booking for
20-1-004
Secretary for room - Veronique Wedlake
78116
People list:
CERN : Alfredo=Alfredo
Placci, Wolfgang=Wolfgang Funk,
Claude=Claude Charles Detraz,
: Jose=Jose Mulon, Mario=Mario
Scandurra
RAL : RJSG=Justin
Greenhalgh, JAH=John Hill, ABL=Tony
Lodge, KWB=Ken Bell, Brian=Brian
Smith
: DJAC=David Cockerill, Claire=ClaireShepherdThemisocleous
IHEP : Slava=Viatcheslav
Grishin, Vassili=Vassili
Katchanov
INR : Nikolai=Nikolai
Golubev, Vladimir Postoev
Imperial :
Matt Ryan
Milestones
EE activities 2005/6, D Cockerill
pdf doc
2005
Minutes, A Placci 8.11
doc
Important discussions, Fri 24 June 2005:

Minutes, D Cockerill 6.06
doc
Minutes, A Placci 23.05
doc
Minutes, D Cockerill 25.04
doc
Minutes, A Placci 4.04
doc
Minutes, A Placci 14.02
doc
Discussion - Assembly of EE at CERN, D Cockerill 2.2.05
doc
Minutes, A Placci 25.01
doc
2004
Minutes, D Cockerill 15.12
doc
Minutes of Installation Meeting, K Bell 23.11
doc
Minutes, A Placci 15.11
doc
Minutes, A Placci 1.11
doc
Suggested responsibilities/tasks for the Crystal Palace, P
Bloch 21.10
txt
txt2 doc
Tue 26 Oct 2004
Suggested tasks from RAL, RJSG/JAH/ABL/KWB:
1) Dry mount of all Positional Spacers on 1 (?2) Dee,
including shoulder bolts,
2) Make sure geometry really looks plausible
3) Make sure all shoulder (& conventinal) bolts fit
4) Check status/required delivery date of the other 2
Dummy Dees - they need to be mounted early in Jan.
5) Check patch panel status
Suggested tasks from CERN, Claude:
1) Design modifications to
glue
VPTs to crystals with the Barrel
(bldg27) system (Mario)
2) Drawing of new feet for frame
(Mario)
3) Clarify interaction with Sourkov/Levin for
installation modifications to the frames
4) Preparation for meeting with Saclay on Wed Nov
4
Suggested tasks from DJAC:
1) Prepare for ECAL Electronics test stand for
umbilical/HVcards/noise tests
2) SC construction database