Complete 2004 page record for Dee assembly


First mounting of positional spacers, Crystal Palace, Nov 1st
DSCN0155.JPG (172854 bytes) DSCN0156.JPG (158949 bytes) DSCN0157.JPG (156556 bytes) DSCN0158.JPG (157043 bytes)
First Dee in its transport frame
manip.chassis4.JPG (696549 bytes) manip-chassis2.JPG (692334 bytes) manip-chassis3.JPG (716130 bytes) manip-chassis5.JPG (702292 bytes) manip-chassis7.JPG (720177 bytes)

Dummy Dees
manip-chassis.JPG (732625 bytes) manip-chassis1.JPG (703208 bytes)

Arrival of first endcap of large mechanics at CERN, J Hill, 16.6.04
CP_inside.jpg (167103 bytes) EndCap_arrival.jpg (223744 bytes) EndCap_arrival2.jpg (276418 bytes) EndCap_arrival3.jpg (234601 bytes)
EndCap_arrival4.jpg (244502 bytes) EndCap_arrival5.jpg (240086 bytes)

EndCap_arrival6.jpg (193679 bytes) EndCap_arrival7.jpg (195637 bytes) EndCap_arrival8.jpg (169294 bytes) EndCap_arrival9.jpg (182831 bytes)

Visit to TM, 11 Aug 2004
bp_2&3.jpg (247475 bytes) ps_partial1.jpg (205478 bytes)
Backplates 3and 4 and inner partial seating elements
ps_partial2.jpg (223624 bytes) sr_test2.jpg (230964 bytes) sr_test3.jpg (267366 bytes) sr_test5.jpg (188591 bytes)
Ring flanges and ring flange load tests


Film of Dalmec manipulator in operation, 10.6.04 FilmManipulator
The file name is: "FilmManipulator" (size ~4 Mb) It can be viewed using Quicktume. 
Quicktime can be downloaded for free from the Apple webside: www.apple.com 
Visit to TM after alodyning first Endcap, J Hill, 10.6.2004 link
Visit to Dalmec, Lucie Linssen, Alfredo Placci, 27.5.2004 doc photos

Provisional summary of acceptance tests at TM, D Cockerill, 29.4.2004 ppt
Pictures taken at TM, BP cooling layout, mirrored positional spacers & ring flange load test,
J Hill & Justin Greenhalgh, Wed 28 April 2004 link
Pictures taken at TM, BP & ring flange tests, J Hill & Justin Greenhalgh, Wed 21 April 2004
(click on photo to get full jpg):
backplate1.jpg (276608 bytes) K1J1H1G1.jpg (514686 bytes) K1K2J1J2.JPG (180322 bytes) D4D5E4E5.jpg (204325 bytes) A4A5A6A7.jpg (211594 bytes)
A4A5B4.jpg (227533 bytes) C8C9D8D9.jpg (179866 bytes) K1J1J2J3.jpg (154351 bytes) K1K2J1J2_side.JPG (467548 bytes) K1J1H1G1_side.jpg (145822 bytes)
Geometric test with 4 SCs at various positions on the Dee backplate. Note the precision fitting.

 cool_circuit_test.JPG (172185 bytes) cool_circuit1.JPG (199745 bytes)
Test of the BP cooling serpentine

sup_ring_machine.jpg (215498 bytes) sup_ring_tested.jpg (239475 bytes) sup_ring_tested2.jpg (228239 bytes) sup_ring_tested3.jpg (201973 bytes)
Ring flange machining and load test preparation

survey1.jpg (219885 bytes) survey2.jpg (186199 bytes) survey3.jpg (201076 bytes)
Laser survey of Backplate and the precision holes           
Pictures taken at TM, BP precision drilling & ring flange machining, J Hill, Tue 30 March 2004 link
Pictures taken at TM, Wed 10 March 2004, J Hill txt link