First mounting of positional spacers, Crystal Palace, Nov
1st
First Dee in its transport frame
Dummy Dees
Arrival of first endcap of large mechanics at CERN, J Hill, 16.6.04


Visit to TM, 11 Aug 2004

Backplates 3and 4 and inner partial seating elements

Ring flanges and ring flange load tests
Film of Dalmec manipulator in operation, 10.6.04
FilmManipulator
The file name is: "FilmManipulator" (size ~4 Mb) It can be viewed
using Quicktume.
Quicktime can be downloaded for free from the Apple webside: www.apple.com
Visit to TM after alodyning first Endcap, J Hill, 10.6.2004
link
Visit to Dalmec, Lucie Linssen, Alfredo Placci, 27.5.2004
doc
photos
Provisional summary of acceptance tests at TM, D Cockerill, 29.4.2004
ppt
Pictures taken at TM, BP cooling layout, mirrored positional spacers & ring flange
load test,
J Hill & Justin
Greenhalgh, Wed 28 April 2004 link
Pictures taken at TM, BP & ring flange tests, J Hill & Justin
Greenhalgh, Wed 21 April 2004
(click on photo to get full jpg):

Geometric test with 4 SCs at various positions on the Dee backplate. Note the
precision fitting.
Test of the BP cooling serpentine

Ring flange
machining and load test preparation

Laser survey of Backplate and the precision holes
Pictures taken at TM, BP precision drilling & ring flange
machining, J Hill, Tue 30 March 2004 link
Pictures taken at TM, Wed 10 March 2004, J Hill
txt link