Visual inspection - photocathode statistics, B Kennedy xls
Note: visual inspection for missing photo-cathode regions needs natural light
6.9.2002 results from Split
11.6.2002 1648 & 1973 handed to Nikola Godinovic at CERN for measurements
at Split.
Comments on data from Nikola Godinovic htm
VPT RIE number 1648, barcode #728
RAL visual inspection comment: bad, significant visual non-uniformity at 40%
level (11.6.2002)
Scan ps pdf
reverse scan ps pdf
stability ps
pdf
Data .txt files: scans l_up
l_dw
stability l_up l_dw
Current location of tube: Split, as of 9.12.2002
VPT RIE number 1973, barcode #864
RAL visual inspection comment: bad, significant visual non-uniformity at 25%
level (11.6.2002)
Scan ps pdf
reverse scan ps pdf
Data .txt files: scans l_up
l_dw reverse scans l_up
l_dw
Current location of tube: Split, as of 9.12.2002
13.7.2001 results from Split
VPT barcode # 137
RAL visual inspection comment: good uniformity
(27.4.2001)
Scan ps pdf
jpg hbook
Current location of tube: CERN RAL office, as of 9.12.2002
VPT barcode # 354
RAL visual inspection comment: bad, 20%
crescent of missing photo-cathode (27.4.2001)
Scan ps pdf
jpg hbook
Current location of tube: CERN RAL office, as of 9.12.2002