|
The collection and grouping of the token ring
blue cables.
Note the LVR connectors for the low voltage. |
 |
The grouping of the TRL cables (blue).
The grouping of the GOH fibres (green).
Note the LVR connectors for the low voltage. |
 |
Ditto. |
 |
The grouping of GLH fibres over several FE
boards.
Notice the wide loops needed for the fibre as it leaves the GOH. |
 |
Grouping of the TRL blue cables, and secreting
them under the cooling manifold. |
 |
Ditto. |
 |
The GOH fibres finding there way to the 'fan-out'
boxes.
The 12 way ribbon can be seen leaving the top left box. |
 |
Detail of a 'fan-out' box |