2009
Maintenance of CMS ECAL End Cap - Remote Handling,
J Hill 27.8
text
pdf
2008
Pre Shower fixtures on Dee Environmental Screen,
J Hill 14.11
htm pdf
EE Installation notes + New Dee removal scenario,
J Hill 13.11
htm pdf
EE
Engineering Design Monitor Notes, July01-Aug08, J Hill 30.9
pdf
Dee general assembly dwg, TD-1138-500, J Hill
pdf
ps
pgl
2007
SC - SC gaps survey on RHS quad (from front) of Dee1, J Daguin 16.10
xls
ppt
txt
SC-SC gaps survey on RHS quad (from front) of Dee1, overall array size, slide 9,
D Cockerill 15.10
ppt
Cooling review (updated), D Cockerill for 13.9
ppt
2006
M3 screw for securing VFE/LVR cards/housings to the cooling bars, M Scandurra
11.9 479
Draft presentation of EE design status, D Cockerill 7.7
ppt
Preshower cone with Dee 3, measurements, P Ford 28.5
pdf
Trigger and data fibre routing on Dee, J Hill 24.4
Mechanical overview of fan-in
distribution boxes
Allocations of fan-in distribution
boxes to trigger or data ribbons
Yellow ribbon fibre runs to the
patch panel from the distribution boxes and trlb's
Distribution boxes by readout sector
EE envelope definitions from Ingenito, K Bell 20.2
eb-sd-1999
eb-sd
Data/trigger
box locations and lengths for digital readout fibres, J Hill
14.2
txt layout
layout2
layout3
lengths
2005
EE Engineering status, UK mtg at Brunel, J Hill 2.9
movie
pdf
ppt
VPT pulser box size and locations (brown boxes) on the patch panel, J Hill 9.6
pdf

Hall probe readout system used by the CMS magnet, D Campi, 10.5 txt
pdf , Dave's email
txt
2004
Discussion on DCS integration, W Funk, G Dissertori, D Cockerill, 20.2 txt
Betatherm thermsistors for monitoring Supercrystal temperature link
2003
Dee lab preparation, Lucie Linssen 21.11 link
Progress at TM, J Hill 24.10 txt
+ sample piece photos link
Measurements on material thermal conductivities, P Flower 19.8 doc
SC rotation, top quad to lower quad, D Cockerill 7.8
pdf
doc
Mechatronics drawings for SM module 3, J Greenhalgh 18.7 txt zip
Dee Assembly profiles, Lucie Linssen 10.7 ppt
Comments on thermal work, P Flower 11.6 txt
2002
LV and Services, ECAL (EE) Mechatronics discussion, 28.11 T
Lodge ppt (20.4MB)
Updated EE services note and next steps, J Greenhalgh, 11.11 doc
xls
Proposed Dee SC numbering scheme, 8.7 txt
2001
Measurement of the effect of changing heat load on a supercrystal,
First draft, P.S.Flower 9.11 doc
Summary of heat flow tests on a Supercrystal, P Flower, 31.10 doc
2000
EE Envelope, A. Herve, A Ball , G Faber, P Ingenito 18.9 edms
Isometric view, EE +EB, Patrick Ingenito 18.9
ps ,
pdf
General CMS parameter dwg, Quarter view to HCAL 18.9 edms
General CMS parameter dwg, Quarter view to Return Yolk, Muon Chambers, HF,
18.9
edms
Pro E of a Dee 'exploded' 24.8
ps
Pro E view of 2 Dees, with partial supercrystals
24.8 tif
Pro E view of complete Endcap + thermal shield and
Preshower 24.8
tif
Discussion of Supercrystal survey procedures during assembly of Dee
G Barber (Imperial College) and C Lasseur (CERN) 8.2 doc
1999
HE end view and side view showing absorber wedges, from CDD, Faber 5.11
pdf
HE end view and side view showing absorber structure, from CDD, Faber 5.11
pdf
FEA analysis of 'Stiffness of perforated plates', J Greenhalgh 1.9
doc
HE end view and side view showing eta boundaries,
from CDD, Faber 20.8
pdf
HE quarter end view and side view, from CDD, Faber 20.8
pdf
First ProE view of a Dee (including floating 50 ch readout
module for scale)
ps pdf
SC clearance on Dee, 18.6
doc
Endcap weights 19.5 html
Initial area estimate and list of requirements for Dee construction, G Barber,
Jan 10.1 ps
1998
Clearance and tolerance issues for the SC arrays on the Dee, 24.8
doc
Equipment/cupboards
Oct 16 2003 Cupboards/items shipped from
867 by C Detraz, - new locations txt
Cupboards/keys txt