From: Hill, JA (John) [john.hill@stfc.ac.uk]
Sent: 14 November 2008 08:44
To: Wolfgang Funk; Ken Bell
Cc: Piet Wertelaers; Dave Cockerill
Subject: Pre Shower fixtures on Dee Environmental Screen

Attachments: 7954-00-00-00 S1(ES HOLES).pdf

Wolfgang/Ken,

I was asked some time ago a question regarding the fixtures for the Pre Shower fingers as I understand there was some discrepancy between them during ES structure installation.

There were many drawings produced for the Environmental screen by I believe the one attached shows where the holes ‘should’ be, I can only assume that these dimensions were tied up between Levin/Wertelaers some time ago.

In summary the holes are on a 1542 radius, 20 M6 holes per End Cap (10 per Dee), at the angles shown on the diagram attached left view.

Regards

John

 

 

 

John A Hill IEng MIED

Project Engineer, Mechanical Design

Science and Technology Facilities Council

Rutherford Appleton Laboratory

Chilton, Didcot, Oxon OX11 0QX


T+44 (0)1235 446611
F+44 (0)1235 446863


<>J.A.Hill@rl.ac.uk

<>http://www.stfc.ac.uk

 

 


--
Scanned by iCritical.