EE Laser Monitoring System


Reference drawings for laser monitoring, Dee1 and Dee3, D Cockerill 21.5.07 ppt
Reference drawings for laser monitoring, Dee2 and Dee4, D Cockerill 21.5.07 ppt

2009
Diffusing spheres, PN numbering and FED assignments, M Dejardin  11.3 comments  txt

2007
Diffusing spheres on Dee1, M Scandurra 3.7
IMG_0024.JPG (151248 bytes) IMG_0025.JPG (161465 bytes) IMG_0026.JPG (147395 bytes) IMG_0027.JPG (141708 bytes) IMG_0028.JPG (143474 bytes) IMG_0029.JPG (155421 bytes)
IMG_0030.JPG (142751 bytes) IMG_0031.JPG (154430 bytes) IMG_0032.JPG (173053 bytes) IMG_0033.JPG (144194 bytes) IMG_0034.JPG (142874 bytes) IMG_0035.JPG (143966 bytes)
IMG_0036.JPG (144843 bytes) IMG_0037.JPG (143454 bytes) IMG_0038.JPG (143273 bytes) IMG_0039.JPG (136783 bytes) IMG_0040.JPG (146559 bytes) IMG_0041.JPG (143976 bytes)IMG_0042.JPG (145324 bytes) IMG_0044.JPG (146162 bytes) IMG_0045.JPG (140041 bytes) IMG_0046.JPG (149475 bytes) IMG_0047.JPG (128034 bytes) IMG_0048.JPG (124802 bytes)IMG_0049.JPG (134239 bytes) IMG_0050.JPG (99604 bytes) IMG_0051.JPG (76923 bytes)

Dee1 fibre layout completed 27.6
DSCN1384.JPG (896213 bytes)
Saclay laser safety details, C Jeanney 14.6 txt doc
Drawings for laser monitoring, Dee1 and Dee3, D Cockerill 21.5 ppt
Drawings for laser monitoring, Dee2 and Dee4, D Cockerill 21.5 ppt
Decisions on laser mapping for endcaps, W Funk from 2.11.2005, slightly modified by DJAC 20.5 htm ppt

2006
The new (provisional) drawings for laser monitoring fixings, M Anfreville 31.1 dxfg dxfd pdfg pdfd

2005
EE laser mapping, W Funk 20.9 pdf ppt
Response concerning new schemes, M Dejardin 8.9 txt
Possible new fibre mapping scheme on EE to follow DCC boundaries, W Funk 12.7 txt ppt
Possible new fibre mapping scheme on EE to follow DCC boundaries, D Cockerill 8.7 txt ppt


2004
Discussion about SC loader arm and consequences for fibre placement, B Didier, 21.10 htm
L
es derniers plans du Patch Pannel Monitoring pour les EndCaps, M Anfreville, 19.10 dxf40 dfx41 dfx42 dfx43 dfx44
Patch panel, fixings and supports,
M Anfreville, 12.10 dxf28a dxf28 dxf29 dxf41a
Discussion, laser events needed for good precision, C Seez/L Malgeri 7.10 htm pdf
Items for EE needed before 3-4.11 meeting, B Didier, 01.10 htm
Action list from meeting of 22nd September, B Didier 23.9 htm doc

2002
View of laser fibre distribution on Dee, extracted from M Anfreville's talk, D Cockerill ppt
EE EDR-04,
EE fibre optic routing across Dee, Dee MEM box, M Anfreville 13.3    doc

1999
Fibre Optic Monitoring Layout ECAL week, AB Lodge 18-22.10        ppt
Level 1, Level 2, MEM and PN diodes layout, AB Lodge 18-22.10     doc
MEM module and fibre layout schemes, AB Lodge 18-22.10               doc
Current questions on Monitoring, AB Lodge 18-22.10                          doc
Schematic layout of the system, AB Lodge 5.8                                      ps, pdf