EE Milestones and Planning 

CMS schedule and milestones, SX and UX installation plans


2008
Manpower needs for EE build, D Cockerill 19.3 htm

2007
Cooling block and main manifold planning, D Cockerill 20.3 xls
Dee4 installation planning at H4, D Cockerill 20.3 xls
First months, provisional Dee4, Dee1, E0prime, H4, H2 planning, D Cockerill 6.3 xls

2006
Provisional ECAL manpower planning, P Bloch 4.8 tech-missing planning pdf mpp phys-eng-missing
CMS planning, V35.0, LHCC reviews 28.6 pdf
Planning for Dee4, and all EE, components, J Hill 23.6 pdf
Planning for all EE mechanics, J Hill 22.6 mpp pdf
Dee1 planning issues, draft 3 D Cockerill 3.5 pdf doc
Dee1 planning issues, draft 2 D Cockerill 27.4 pdf comments
Dee1 planning issues, draft 1 D Cockerill 25.4 pdf
Responsibilities and dates for test beam Dee4 assembly, D Cockerill  version 10.3 doc

2005
Last attempt at EE plan to completion, J Greenhalgh 13.12 mpp
Last attempt at Dee4 planning, J Greenhalgh 13.12 txt mpp
Mechatronics and Dee4 planning, J Hill 13.12 txt mpp pdf
Dee 4 at H4 - description and planning, D Cockerill/J Greenhalgh 17.6 ppt txt mpp
EE planning overview on one slide, J Greenhalgh, 3.06 pdf
EE and Dee4 detailed planning, J Greenhalgh 3.06 pdf
EE activities 2005/6, D Cockerill updated 20.4 pdf doc

Level 1 and Ready for Installation (RFI) milestones, K Bell 14.4  pdf xls
Crystal Palace milestones, K Bell 22.4 xls pdf
Discussion - Assembly of EE at CERN, D Cockerill 2.2 doc

2004
Draft Level 2 EE milestones updates, K Bell 18.11 2076 2085 2086 2095
Electronics proposed planning, Justin 16.11 ppt pdf

2003
ECAL Planning, from ECAL summary, P Bloch 15.10.03 pdf
SX installation schedule, A Ball Oct 03 pdf
UX installation schedule, A Ball Oct 03 pdf
Detailed planning, EE 361, J Greenhalgh Aug 03 link
EE Planning mtg at CERN 10.7
Update on xtal cutting + new production scenario, P Lecoq, LHCC, May 03 ppt

2002
Nov 2002
, Detailed plan, milestones, miniplan, J Greenhalgh link
Planning for large mechanics tender, J Hill, Oct 2002 xls
Draft EE milestones, J Rander, 5.9.2002 xls
Possible electronics planning, P Sharp, 3.7.2002 xls
Possible EE/EB crystal production schedule, P Lecoq, 8.6.2002 ppt
Pre-EDR workshop, 17.5.2002 EE planning, J Greenhalgh, link 
Possible EE/EB crystal production schedule, P Lecoq, Jan 2002 ppt

CMS Planning

CMS General Planning and Milestones, web edms
Current ECAL Planning, edms

EE contracts

VPT contract

Alveolar contract status xls

Supercrystal Planning

R&D proposal for the Supercrystal, B Smith, Sep 98 ps

  

Project Breakdown and Work Breakdown Structures

PBS for EE and EB xls 10.02.00
WBS for EE xls 10.07.00
WBS - reasons for update doc 10.07.00