CMS schedule and milestones, SX and UX installation plans
2008
Manpower needs for EE build, D Cockerill 19.3
htm
2007
Cooling block and main manifold planning, D Cockerill 20.3
xls
Dee4 installation planning at H4, D Cockerill 20.3
xls
First months, provisional Dee4, Dee1, E0prime, H4, H2 planning, D Cockerill
6.3 xls
2006
Provisional ECAL manpower planning, P Bloch 4.8
tech-missing
planning pdf
mpp
phys-eng-missing
CMS planning, V35.0, LHCC reviews 28.6
pdf
Planning for Dee4, and all EE, components, J Hill 23.6
pdf
Planning for all EE mechanics, J Hill 22.6
mpp
pdf
Dee1 planning issues, draft 3 D Cockerill 3.5
pdf
doc
Dee1 planning issues, draft 2 D Cockerill 27.4
pdf
comments
Dee1 planning issues, draft 1 D Cockerill 25.4
pdf
Responsibilities and dates for test beam Dee4 assembly, D
Cockerill version 10.3
doc
2005
Last attempt at EE plan to completion, J Greenhalgh 13.12
mpp
Last attempt at Dee4 planning, J Greenhalgh 13.12
txt
mpp
Mechatronics and Dee4 planning, J Hill 13.12
txt
mpp
pdf
Dee 4 at H4 - description and planning, D Cockerill/J Greenhalgh
17.6
ppt
txt
mpp
EE planning overview on one slide, J Greenhalgh, 3.06
pdf
EE and Dee4 detailed planning, J
Greenhalgh 3.06 pdf
EE activities 2005/6, D Cockerill
updated 20.4
pdf doc
Level 1 and Ready for Installation (RFI) milestones, K Bell
14.4
pdf
xls
Crystal Palace milestones, K Bell 22.4
xls
pdf
Discussion - Assembly of EE at CERN, D Cockerill 2.2
doc
2004
Draft Level 2 EE milestones updates, K Bell
18.11
2076
2085
2086
2095
Electronics proposed planning, Justin 16.11
ppt
pdf
2003
ECAL Planning, from ECAL summary, P Bloch 15.10.03
pdf
SX installation schedule, A Ball Oct 03
pdf
UX installation schedule, A Ball Oct 03
pdf
Detailed planning, EE 361, J Greenhalgh Aug 03 link
EE
Planning mtg at CERN 10.7
Update on xtal cutting + new production scenario, P Lecoq, LHCC, May 03 ppt
2002
Nov 2002, Detailed plan, milestones, miniplan, J Greenhalgh link
Planning for large mechanics tender, J Hill, Oct 2002
xls
Draft EE milestones, J Rander, 5.9.2002
xls
Possible electronics planning, P Sharp, 3.7.2002
xls
Possible EE/EB crystal production schedule, P Lecoq, 8.6.2002
ppt
Pre-EDR workshop, 17.5.2002 EE planning, J Greenhalgh, link
Possible EE/EB crystal production schedule, P Lecoq, Jan 2002 ppt
| CMS General Planning and Milestones, web edms | ||
| Current ECAL Planning, edms |
VPT contract
Alveolar contract status xls
| R&D proposal for the Supercrystal, B Smith, Sep 98 ps |
| PBS for EE and EB | xls | 10.02.00 |
| WBS for EE | xls | 10.07.00 |
| WBS - reasons for update | doc | 10.07.00 |