Alveolar
measurements
Assembly instructions-B Smith
Assembly jig drawings
Barcodes for EE
HV filter
wiring procedure - T Lodge
Thermister status
Umbilical
VPT/crystal
multibox HV tester
2008
SC assembly sheets from bat27
Dee1-2
Dee3-4
2007
SC assembly summary for Dee4 testbeam SCs + some for Dee1, D
Cockerill 2.10 xls
CRISTAL data for all SCS to date, c2k, D Cockerill 4.9
txt
HV card, clamp and fibre optic support arrangements inside type 1 and
type 2 (Dee4) SCs, D Cockerill 13.3
ppt
Orientation on Dee and standard SC crystal assembly sequence, D Cockerill
13.3
ppt
Partial SC crystal assembly sequence, D Cockerill 13.3
ppt
Inserts for partials, D Cockerill 13.3
ppt
2006
Drawings and photos for SC assembly and mounting on Dee, D Cockerill
15.5
ppt
2004
Crystals available for SC05/6/7, 61 at RAL:
45 Jul 2001 preprod, 14+2 Oct/Dec 2003 prod, B Smith/D Cockerill 29.11
xls
Instructions, VPT-Xtal gluing with RAL jig,
165-IS003, B Smith 1.11 doc
Proposed SC05 crystal list, D Cockerill 7.9
txt
2004 test beam with SC03 and SC04 on E0'
details
SC04
15 crystals with APDs. SC later dismantled.
SC03
route card
2003
Request for 130 sorted VPTs for SC assembly, D
Cockerill 20.11 txt
List of crystals at IC, M Ryan 20.10.03 pdf
List of crystals at RAL, B Smith 20.10.03 txt
xls
'No excuses' build sequence for SC03 to be mounted on E0', D
Cockerill 10 June doc
Request + details to start SC03, D Cockerill 15 May txt
xls
2002
Schematic of the "Clara" database at RAL, J Williams, 7.6.2002 pdf
2001
SC02
Started 01.05.01. Finished 04.07.01
25 Y/Nb doped crystals from 100 R&D phase3 (1.6.2000), 2279-2357.
VPTs from 500 pre-production run from RIE, barcode no's 2-98.
See route card for VPT/xtal positions and build details
doc
Regional Centre Database procedures and flow diagrams, J Williams, 10.5.2001 pdf
SC01 Started 12.03.01. Finished 09.05.01
25 3x3x22 cm3 La doped crystals from the prototype 5x5.
Crystals 2174-2203. VPTs from 500 pre-production run from RIE, company no's 211-447
See route card for VPT/crystal positions and build details
doc
1998 - 1999
CRISTAL Database discussion document, H Heath, 30.10.99 doc
RAL Regional Centre, Initial Design Study, Smith-Connolly-Lodge, 22.9.1999 doc
Table 1 xls, Table 2 xls,
Table 3 xls, Table 4 xls,
Table 5 xls
Fig 1 xls, Fig 2 xls,
Fig 3 xls, Fig 4 xls
Prototype 5x5 Dec 1998 - March 1999. 25 La doped 3x3x22 cm3 full sized EE crystals:
hpgl pdf
Prototype 1" VPTs: 9 Ham, 6 RIE, 10 ET. Arrangement array
Beam tests H4/H2, summer 1999. Dismantled Dec 1999 to replace 1 cm aluminium
front end stops with 6 mm glass fibre end stops. Beam tests H2, summer 2000.
Dismantled Dec 2000, Prototype VPTs unglued from crystals. Crystals reused in SC01.
1997 - 1998
Mini SC, 3x3
27.10.97 - 22.5.98. 22 mm diameter prototype VPTs: 4 RIE, 5 ET.
2.5x2.5x22 cm3 crystals, numbers 1956-1964
As of 02.07.2002, in Y2K lab at RAL.