2007
A line of 42 completed and tested SCs, SC assembly corridor in the
Crystal Palace, D Cockerill 22.8
2006
10 SCs assembled and equipped with HV filter cards, 15.11
Fibre optic clamp head, 13.7
VPT to crystal gluing tests, preparation of HT test box and first 30 VPTs
(27.3) and crystals glued in bldg 27 by Herve Cornet 15.5
2005
Pictures of the SC assembly jigs, Crystal Palace, K Bell
10.6
Photos of modified R27 xtal-VPT gluing jig, C Detraz
23.5
2004
EE SIC crystals equipped with APDs for SC04
Insertion of the first three rows of crystals into SC03, crystals from SIC (Jan,
2004)
Brian Smith completing the endstops for SC03
Completed SC assembly in the jig at the Crystal Palace at CERN.
Ken Bell and Tony Lodge put the finishing touches.