SC Assembly Instructions


1. SC unit build process doc
2. Gauging alveolar units, B Smith 4.2 doc
3. VPT-Xtal gluing preparation, 165-IS003, B  Smith, 1.11 doc

4. Crystal preparation (shading etc) doc
5. Dispenser settings, syring filling etc doc
6. Bonding VPT to crystal doc
7. Alveolar preparation
8. Endstop/Tyvek preparation and gluing
9. VPT/crystals into cells
10. HV cards/SC soak tests