EE Trigger meeting at LLR, 29/30 June 2005


LLR: Philippe Busson, Ursula Berthon, Stephanie Baffioni
RAL: Dave Cockerill, Ken Bell, Tony Lodge
CERN: Wolfgang Funk
Bristol: Helen Heath
Saclay: Philip Gras, Irakli Mandjavidze
N.W.: Meyda Velasco

Summary, K Bell, 1 July 2005

15.00 Wed June 29

1) Timescale for EE umbilicals/motherboards/                       ppt    Dave Cockerill  
     Nov 2005 EE Review                                 

2) Update on any 5 corrections, relative geometry                 ppt    Helen Heath
across the endcaps and possible numbering scheme

3) TPG simulation in ORCA                                                  ppt    Ursula Berthon

4) A reference XML file for the any 5 geometry                     Discussion

5) Proposal for the arrangement of EE electronics                  Tony Lodge
    The ppt file has embedded links to the doc and xls files below it.
                           EE Numbering System_L.ppt
                           EE+F & EE-N_Crystal_Allocations.doc
                           EE+N & EE-F_Crystal_Allocations.doc
                           EE_TRLB_MAP1.doc
                           EE+F & EE-N_Cooling_Bars.doc
                          
EE+F & EE-N_FE_Card_Numbering.doc
                           EE+F & EE-N_LVD_Bars.doc
                           EE+N & EE-F_Cooling_Bars.doc
                           EE+N & EE-F_FE_Card_Numbering.doc
                           EE+N & EE-F_LVD_Bars.doc
                           EE+N & EE-F_TRLB.doc
                           Patch Panel Connectors.doc
                           Patch Panel Numbering.doc
                           Service Duct Numbering.doc
                           SC2.xls
                           SC6.xls

6) DAQ data overhead for the EE readout scheme                ppt    Discussion

10.00 Thu June 30

7) Role of the SRP                                                                 pdf    Irakli Mandjavidze

8) Plans for a new TCC for the endcaps                                 ppt    Philippe Busson

9) Fibre input order to the TCCs and DCCs                           Discussion

10) CMS note on EE electronics layout/trigger layout              Discussion
and numbering scheme

11) Who does what, by when for the Nov 2005 EE review     Discussion

 

Notes
Take RER to Lozere, ring Philippe for lift to LLR, tel: 01 6933 3064
Helen, Tony, Dave, Ken arrive AF1271 at CdG at 12.25, expect to arrive at LLR ~14.00-14.30.
Wolfgang arrives from GVA at CdG at a similar time
N.B.
If you want to use your laptop and be connected to the net, provide LLR with the MAC address of your machine in order to get the proper rights access.