LLR: Philippe Busson, Ursula Berthon, Stephanie Baffioni
RAL: Dave Cockerill, Ken Bell, Tony Lodge
CERN: Wolfgang Funk
Bristol: Helen Heath
Saclay: Philip Gras, Irakli Mandjavidze
N.W.: Meyda Velasco
Summary, K Bell, 1 July 2005
15.00 Wed June 29
1) Timescale for EE umbilicals/motherboards/
ppt
Dave Cockerill
Nov 2005 EE Review
2) Update on any 5 corrections, relative geometry
ppt
Helen Heath
across the endcaps and possible numbering scheme
3) TPG simulation in ORCA ppt Ursula Berthon
4) A reference XML file for the any 5 geometry Discussion
5) Proposal for the arrangement of EE electronics
Tony Lodge
The ppt file has embedded links to the doc
and xls files below it.
EE Numbering System_L.ppt
EE+F & EE-N_Crystal_Allocations.doc
EE+N & EE-F_Crystal_Allocations.doc
EE_TRLB_MAP1.doc
EE+F & EE-N_Cooling_Bars.doc
EE+F & EE-N_FE_Card_Numbering.doc
EE+F & EE-N_LVD_Bars.doc
EE+N & EE-F_Cooling_Bars.doc
EE+N & EE-F_FE_Card_Numbering.doc
EE+N & EE-F_LVD_Bars.doc
EE+N & EE-F_TRLB.doc
Patch Panel Connectors.doc
Patch Panel Numbering.doc
Service Duct Numbering.doc
SC2.xls
SC6.xls
6) DAQ data overhead for the EE readout scheme ppt Discussion
10.00 Thu June 30
7) Role of the SRP pdf Irakli Mandjavidze
8) Plans for a new TCC for the endcaps ppt Philippe Busson
9) Fibre input order to the TCCs and DCCs Discussion
10) CMS note on EE electronics layout/trigger layout
Discussion
and numbering scheme
11) Who does what, by when for the Nov 2005 EE review Discussion
Notes
Take RER to Lozere, ring Philippe for lift to LLR, tel: 01 6933 3064
Helen, Tony, Dave, Ken arrive AF1271 at CdG at 12.25, expect to arrive at LLR
~14.00-14.30.
Wolfgang arrives from GVA at CdG at a similar time
N.B.
If you want to use your laptop and be connected to the net, provide LLR with the
MAC address of your machine in order to get the proper rights access.