EDR-06, Sep 02 pre-EDR, May 02 Workshop, Mar 02 EDR-04, Nov 00
EE Jamboree, 31.3 - 2.4.03 link
ECAL EDR-06 , 3-4 Sep, 2002 EDMS
| Conclusions | A Herve doc pdf edms | |
| Frontispiece | doc | |
| Contents | doc pdf | |
| EE Animation | J Hill avi (6.6MB) | |
| Proposed Agenda (29.8.2002) | doc pdf | |
| EE Glossary of terms | ||
| 1. Introduction and Scope | doc ppt | |
| 2. Basic structure of EE | J Greenhalgh ppt | |
| 3. Major mechanics | 3.1 Introduction | J Hill ppt |
| 3.2 Backplate | J Hill doc ppt | |
| 3.3 Ring Flange | J Hill doc ppt | |
| 3.4 Shims | A Levin pdf | |
| 3.5 Environmental Shield | A Levin pdf | |
| 3.6 Envelopes | J Hill ppt | |
| 4. Analysis and tests | 4.1 Introduction | J Greenhalgh doc ppt |
4.2 Structural |
4.2.1 Backplate and ring flange | A Abramov doc ppt |
| 4.2.2 Environmental Shield | V Gusev doc figs ppt | |
4.3 Thermal |
4.3.1 Introduction | J Greenhalgh ppt |
| 4.3.2 EE/SE tests | J Greenhalgh ppt | |
| 4.3.3 Region behind backplate | J Greenhalgh ppt | |
| 4.3.4 Environmental Shield (outer, front, backplate) |
A Riabov ppt |
|
| 4.3.5 Environmental Shield (inner) |
I Wichrowska-Polok ppt |
|
| 5. Dee Assembly | G Barber doc ppt | |
| 6. Services | 6.1 Introduction | J Greenhalgh ppt |
| 6.2 Thermal analysis | A Riabov ppt | |
| 6.3 Concluding remarks | J Greenhalgh ppt | |
| 7. Installation | A Surkov pdf Individual figure set link |
|
| 8. QA issues | J Greenhalgh ppt | |
| 9. Timescales | Overview | J Greenhalgh ppt |
| Detailed plan | J Greenhalgh mpp | |
| Mini plan presentation | J Greenhalgh mpp | |
| UK Project specification document |
J Greenhalgh pdf
appendix1 |
|
| 10. Formal response to EDR-04 issues | D Cockerill pdf ppt | |
| Procedures section | ||
| 11. Summary and conclusions | J Greenhalgh ppt | |
EDR Chapter separators doc pdf
Pre-EDR Workshop, 17 May, 2002
| Conclusions |
P Bloch doc J Greenhalgh txt |
| Agenda, Fri, am, 17 May, 2002 | doc |
| Dee Mechanics, envelopes | J Hill, --- |
| Thermal FEA update | J Greenhalgh, link |
| EE Services | J Greenhalgh, ppt |
| EE planning | J Greenhalgh, link |
EE Workshop, 12-14 March, 2002
| Conclusions and action list | D Cockerill, pdf |
| Services issues | J Greenhalgh, ppt |
| Agenda | doc |
| Tue, March 12, 2002 | |
| Goals | D Cockerill, doc |
| Pre EDR intro, EE planning & critical paths | J Greenhalgh, ppt pdf |
| Proposed scope of next EDR | D Cockerill, doc |
| Design criteria for EE mounting/dismounting | D Cockerill, doc |
| Wed (am), March 13, 2002 | |
| EE Mechanical design | J Hill, ppt |
| Environmental Screen | A Levine, doc pdf dxf |
| Dee Assembly | G Barber, ppt |
| EE fibre optic routing, Dee MEM box | M Anfreville, doc |
| Mechanical FEA - background | J Greenhalgh, A Abramov ppt pdf |
| EE/HE FEA analysis | A Abramov, doc |
| EE/HE FEA analysis, during installation | A Abramov, ppt |
| EE/HE FEA analysis, during operation | A Abramov, ppt |
| Installation in CMS | A Surkov, doc pdf |
| Wed (pm), March 13, 2002 | |
| ECAL cooling system | P Baillon, ppt |
| EE Thermal issues | J Greenhalgh, ppt pdf |
| Thermal FEA, backplate | A Riabov,J Greenhalgh ppt |
| Thermal FEA, front environmental screen | A Riabov,J Greenhalgh, ppt |
| Thermal FEA, outer environmental screen | A Riabov,J Greenhalgh, ppt |
| Thermal FEA, eta = 3 region | I Wichrowska-Polok, ppt |
| Thermal FEA, eta = 3 region, cross section | I Wichrowska-Polok, doc |
| EE Services | S Bally, pdf |
| EE Services | P Ingenito, pdf |
| EE Services | J Greenhalgh, ppt pdf |
| Thursday, March 13, 2002 | |
| Overview - ECAL Electronics | P Sharp, doc |
| Electronics integration in EE | A Lodge, ppt |
| Low voltage issues | W Lustermann, pdf |
| VPT High voltage system | R Brown, ppt |
| VPT mass production status | R Brown, ppt |
| EE Trigger Issues | K Bell, ppt |
ECAL EDR-04, 28 Nov 2000
EDR-04 report by A Herve edms
| Submitted documents for EDR-04, EE | edms | |
| EDR-04 chapters + some figures, EE | files | |
| EDR-04 discussion, RAL, Jan, 2000 |