Bristol U, Lancaster U, Liverpool U, Oxford U, QMUL, RAL
Concept 9 November 1998 at Frascati ECFA/DESY workshop, in response to new requirements for linear collider detectors (ultra-fast untriggered readout).
CPCCD operating at RAL 20 May 2003, 1 MHz clock, full parallel readout.
2 phase operation with low amplitude sinusoidal clocks: dramatically reduced feedthrough.
Potential for 1000 times faster readout than standard CCD.
![]() |
![]() |
|
|
The successful CPCCD-1 team (click to enlarge) |